When coverage is difficult to estimate, add more rather than less when doing DIY wall painting. You can always pour the leftover back into cans. For large jobs, use the bucket and a roller screen rather than a roller tray. It’s much faster to load your roller with the screen than to use a roller pan. Simply dunk the roller into the paint bucket, then roll it along the screen until it stops dripping.
To paint a large section without leaving lap marks, roll the nearly dry roller in different directions along the dry edge, feathering out the paint as you go. After completing the entire length of the wall or ceiling, move to the next section and paint over the feathered edges. For the second coat, apply the paint in the opposite direction. This crisscrossing paint application sharply reduces (if not eliminates) lap marks.

I would not recommend this company for the following reasons:1. Original appointment was very specific to them on what was needed and to take photos for 3 apartment unit plumbing fixture repairs. One unit had a bathroom tub/shower backup.2. No photos taken, 3 trips later and only 1 unit completed to satisfaction. (Backup) 3. Other faucets unable to find on line with their suppliers and repair 4. Had to find another plumbing company to complete the jobs. 5. Invoicing had to be redone as not in detail of job address for tax purposes 6. Bad communication throughout the project process with their internal customer service. Their technician and project manager ordering parts. 7. For the back up. Did not bring out correct snake on both trips and had to replace lines as too small to break through backup. Costing over $800 for 3 trips just to complete that situation out. 8. Ordered the wrong parts when 2nd trip out since no photos taken to confirm what was needed. Very dissatisfied and will never ask them to work in any of our rental properties again.
Second: all the tricks of the trade in regard to "cheating" customers is for hustlers and cheaters and NOT established businesses. At the end of the project the job should come out looking professionally painted as specified in the contract. A selected color that takes multiple coats that was not calculated by the contractor should cost more money. It's not the fault of the painter.

The PREP Study is attempting to reduce isocyanate, dust and solvent exposures for autobody shop workers in Connecticut. We have produced a user-friendly DVD-based training program with a great deal of input from the autobody community. The DVD contains information for painters, autobody technicians and anyone else working around a body shop, including:
Beginning with the prep work and ending with last coat of paint or the finishing, an exterior paint job will last anywhere from one to two weeks. After completion, homeowners using low-quality paint will need to repaint every four or five years to keep it well maintained; homeowners using high-quality paint can go longer without a new coat -- usually about seven or eight years, depending on the type of paint and material.

House Painter Co

×